Principal Decommissioning Structural Engineer

Petrofac, Aberdeen

Principal Decommissioning Structural Engineer

Salary Not Specified

Petrofac, Aberdeen

  • Full time
  • Temporary
  • Onsite working

Posted 2 weeks ago, 21 Nov | Get your application in now before you miss out!

Closing date: Closing date not specified

job Ref: 6725b3b474274833aaea2e350cdf74a3

Full Job Description

Petrofac is seeking a Principal Decommissioning Structural Engineer - Contractor for 6 months based in Aberdeen, UK. The role is outside IR35 and we invite Limited Companies to engage. Scope of Services: Provide discipline technical expertise for the structural aspects of facilities decommissioning and destruct in the energy sector

  • Provide technical expertise for the structural design of new and temporary infrastructure and modifications to existing infrastructure to facilitate decommissioning of facilities
  • Provide technical input to estimates for project work scopes (cost & schedule)
  • Provide discipline decommissioning expertise in the support of bids and tenders
  • Project management of structural scope(s)
  • Provide structural subject matter expertise in decommissioning scope execution and tender activities
  • Develop decommissioning strategies
  • Develop project-specific decommissioning processes and procedures
  • Attend and provide input to progress and planning meetings
  • Provide technical expertise to the resolution of technical queries ensuring that all design changes are captured by the change control process
  • Conduct site surveys on offshore or onshore assets
  • Produce structural calculations and analysis
  • Participate in design reviews, constructability reviews / HAZIDS
  • Provide checking and approval of discipline documents, complete interdisciplinary checking of documents where necessary
  • Interface with other disciplines, clients and third parties on technical project issues (close working relationship with construction team to ensure fit-for-purpose, construction-led structural solutions are developed and implemented)
  • Production of discipline documentation deliverables for inclusion in work packs
  • Provide a level of technical support that satisfies the appropriate Asset Safety Case and that the PFEER performance standards ensuring they are not compromised by any discipline engineering activities
  • Compliance with company engineering procedures, industry, international and client codes and standards
  • Ensure that all work complies with the Contract Health, Safety, Environmental and Quality policies, and procedures as appropriate
  • Provides technical assurance and oversight on structural design scope
  • Coordinates structural design resource in line with project requirements Key Deliverables To Develop (But Not Limited To):
  • Survey reports
  • Structural design calculations
  • Structural design and analysis reports
  • Input to project execution plans
  • Input to project basis of design documents
  • Input to concept study / FEED reports, including the development of discipline cost, schedule, and deliverables
  • Requisition (including SDRL)
  • Installation and decommissioning strategy and methodologies
  • Construction and destruct/decommissioning workpack input
  • Weight control reports
  • Presentations sketches etc. to assist in scope communications
  • Marked up photographs and sketches for use in decommissioning/destruct work-packs
  • Technical notes summarizing structural findings
  • Technical queries seeking input from external parties
  • Input to lifting methodologies/plan
  • Input to transportation and installation key deliverables
  • Structural model review/interpretation
  • Bid/tender input
  • Design Deliverables to Check (But Not Limited To):
  • Structural general arrangement drawings
  • Structural detail drawings
  • Structural destruct drawings
  • Installation methodology drawings / documents
  • Rigging drawings
  • Survey reports
  • Structural design calculations
  • Structural design and analysis reports
  • Project execution plans
  • Project basis of design documents
  • Concept study / FEED reports
  • Requisition (including SDRL)
  • Construction workpacks
  • Weight control reports
  • Bid/tender input